A long-term AGV audit should compare the original project assumptions with actual operating data. The most important areas are pallet cycles per hour, vehicle utilization, idle time, charging time, downtime, maintenance costs, labor requirements and warehouse throughput. The audit should also identify whether performance losses are caused by the AGVs themselves, warehouse layout, traffic rules, software configuration or upstream and downstream processes.
A long-term support agreement can include remote diagnostics, software optimization, fleet-performance reviews and engineering recommendations. However, these services are not necessarily included in every standard AGV purchase contract.
For an overseas project, it is better to define post-deployment optimization support in the commercial agreement before purchasing the equipment.
Remote Diagnostics
Review vehicle alarms, navigation exceptions, battery status and operating history.
Performance Review
Compare actual fleet throughput with the original project targets.
Software Optimization
Review traffic rules, task priorities, charging strategies and routing parameters.
Engineering Consulting
Recommend layout or workflow changes when the original operating conditions have changed.
Put the Support Scope in the Contract
Specify the number of optimization reviews, remote-support hours, response times, software-update policy and data-access rights instead of relying on a general statement such as “lifetime technical support.”
The most useful audit data connects robot activity with actual warehouse output and operating expenses. Vehicle movement data by itself does not prove that the project reduced logistics costs.
Throughput
Completed pallet movements per hour, shift and day.
Utilization
Active travel time, task time, waiting time and idle time.
Downtime
Fault-related downtime, recovery time and unavailable vehicles.
Battery
Charging duration, charging frequency and battery health indicators.
Maintenance
Parts consumption, service events and maintenance labor.
Labor
Manual forklift hours replaced or reduced by automation.
This depends on the software architecture and the supplier's data-access policy. Some systems provide dashboards and reports but restrict direct database access. Others provide APIs or structured data exports for integration with warehouse, ERP or business-intelligence systems.
For a long-term audit, API access or scheduled data exports are usually more practical than relying entirely on screenshots from the fleet dashboard.
Dashboard Access
View operational information through the fleet management interface.
Report Export
Export operational reports for periodic analysis.
API Access
Transfer selected operational data to other business systems.
Database-Level Access
Direct access to underlying data may be available only under specific technical agreements.
Do Not Assume Database Access
Ask the supplier before signing the contract what data can be exported, which API endpoints are available, how historical data is retained and whether data remains accessible if the service agreement ends.
A decline in hourly pallet cycles does not automatically mean that the AGVs have become slower. Throughput is affected by the complete warehouse operating environment.
Travel Distance
Check whether pickup and drop-off points have moved farther apart.
Traffic Congestion
Look for intersections, bottlenecks and shared lanes that create waiting time.
Charging Availability
Determine whether vehicles are spending more time waiting for charging opportunities.
Task Queue
Check whether AGVs are waiting because upstream or downstream processes cannot provide tasks.
Navigation Exceptions
Review repeated localization failures, blocked paths and obstacle events.
Vehicle Availability
Compare the number of available vehicles with the original fleet-sizing assumptions.
A useful audit compares vehicle-level performance with system-level performance. If individual AGVs operate normally but the fleet's throughput has declined, the problem may exist in traffic management, task scheduling or warehouse workflow rather than in the vehicles themselves.
| Observed Problem | Potential Area to Audit |
|---|---|
| Vehicles spend too much time waiting | Traffic rules, task queues and shared intersections |
| Longer average travel time | Routing configuration and warehouse layout |
| Frequent localization recovery | Map quality, floor conditions and environmental changes |
| High charging downtime | Charging strategy and fleet energy management |
| Low task completion | Upstream/downstream process availability |
This depends on the software architecture and permissions provided by the Chinese supplier. Warehouse operators may be able to modify parameters such as traffic priorities, restricted areas, task priorities and speed zones without changing the underlying software code.
Direct modification of the dispatch algorithm or navigation software is a different matter. Such changes may require access to the vendor's development environment, APIs, configuration files or source code and could affect system safety or warranty conditions.
Usually Safe to Configure
Traffic priorities
Speed zones
Restricted areas
Task priorities
Charging parameters
Requires Engineering Review
Core dispatch algorithms
Navigation algorithms
Safety-related logic
Vehicle control firmware
Underlying source code
The objective should not simply be to make every AGV drive faster. Increasing speed can create additional congestion and reduce overall system throughput.
A better optimization process identifies the locations where vehicles spend the most time waiting and then adjusts routing, priorities or staging locations to remove those bottlenecks.
1
Collect Data
2
Find Bottlenecks
3
Change Configuration
4
Run Controlled Test
5
Compare KPIs
| KPI | What It Tells You |
|---|---|
| Pallets per Hour | Overall material movement throughput. |
| Fleet Utilization | How much available vehicle capacity is actually being used. |
| Average Task Cycle | Time required to complete a typical pallet movement. |
| Unplanned Downtime | Operational availability and reliability. |
| Charging Time | Energy-management efficiency and charging impact on availability. |
| Maintenance Cost | Actual fleet maintenance expenditure. |
| Labor Hours Avoided | Real-world labor impact compared with the pre-automation baseline. |
The one-year review should compare actual results against the assumptions used in the original business case.
Original Throughput Target
What the project was designed to achieve.
Actual Throughput
What the fleet is actually delivering.
Original Operating Cost
The cost assumptions used for the investment decision.
Actual Operating Cost
Actual labor, energy, maintenance and support costs.
If actual results differ significantly from the original model, investigate the reason before deciding whether additional AGVs are required. A throughput shortfall may be caused by a process bottleneck rather than insufficient vehicle quantity.
Remote diagnostic support and defined response times.
Periodic fleet-performance analysis.
Software updates and configuration support.
API and operational-data access.
Remote map and routing optimization support.
Historical alarm and maintenance-data retention.
Clear responsibilities for software modifications.
Defined procedures for restoring the fleet system after software or server failures.
A Chinese AGV fleet should be audited as an operating system, not simply as a collection of automated forklifts. Regularly reviewing throughput, utilization, downtime, routing, charging and actual operating costs gives warehouse managers the information needed to improve performance and verify the long-term return on automation.
FREE ENGINEERING SUPPORT Stop Gambling on Generic Platforms. Get an AGV/AMR Tailored to Your Warehouse.Buying automated guided vehicles involves complex safety standards (CE/ANSI), navigation setups (Laser SLAM), and ERP system integration. Don't risk your factory safety with middle-men. ✓ 100% Direct Factory: Customized payload up to 5 Tons. ✓ Free CAD Simulation: Send us your layout, and our engineers will simulate the optimal AGV routes. ✓ Global Support: Overseas installation guidance & local maintenance partners. |