When importing a sub-compact AGV from China, the vehicle's published dimensions are only the starting point for logistics planning.
The dimensions that matter to the freight forwarder are the final packed dimensions.

For procurement teams, the key question is not simply:
“How large is the AGV?”
It is:
“What are the final gross dimensions, weight and cubic volume of the complete shipping package?”
A small automated forklift can require substantially more shipping space once the factory adds export crates, protective frames, fork protection, mast protection, batteries, chargers, accessories, spare parts and shock-absorbing materials.
For a rectangular shipping package, the basic calculation is:
Length × Width × Height = Cubic Meters (CBM)
For example, a package measuring 2.4 m × 1.2 m × 1.8 m would occupy approximately 5.18 CBM.
However, this calculation only works when the package can reasonably be treated as a rectangular volume.
An AGV may be packed with irregular components, separate crates or partially disassembled assemblies. Therefore, the freight calculation should use the dimensions of each individual package.
Before booking ocean freight, request a complete packing list. It should include the following information:
| Information | Why It Matters |
|---|---|
| Package number | Identifies each crate or package |
| Package type | Crate, skid, carton, etc. |
| Length / Width / Height | Container and loading planning |
| Net weight | Cargo calculation |
| Gross weight | Handling and unloading equipment |
| CBM | Freight calculation |
| Center of gravity | Lifting safety |
| Lifting points | Destination unloading |
| Stackable / non-stackable | Container loading planning |
Do not rely only on the AGV's product brochure dimensions. The final packing list should be the document used for freight planning.
Possibly, but this cannot be determined from the number of AGVs alone.
The calculation must consider:
Final crate dimensions
Gross weight
Container internal dimensions
Container door opening
Package orientation
Whether crates can be rotated
Whether packages can be stacked
Mast configuration
Battery packaging
Accessories
Required blocking and bracing
This is a common mistake in international logistics.
Suppose three packages collectively occupy less than the nominal cubic capacity of a container. They still may not fit because their individual dimensions cannot be arranged efficiently.
Total CBM < Container CBM does not automatically mean the cargo will fit.
Container loading should therefore be performed using the actual package dimensions, not simply the total cubic volume.
Ask the Chinese factory or freight forwarder for a container-loading plan.
Package dimensions
Package orientation
Loading sequence
Door clearance
Weight distribution
Lashing points
Blocking points
Unloading sequence
A simple top-view loading diagram can eliminate many surprises at the port. For larger or irregular AGVs, a three-dimensional loading plan may be preferable.
It depends on the AGV design and transportation requirements.
Advantages:
Faster commissioning
Less local assembly
Reduced risk of assembly errors
Disadvantages:
Larger shipping volume
More difficult container loading
Greater risk of dimensional restrictions
Possible components include the mast, forks, protective structures, battery, charger and accessories.
Advantages:
Reduced package dimensions
More efficient container utilization
Disadvantages:
More local assembly
Additional commissioning work
Potentially more complex unloading
The correct choice depends on the vehicle design, packaging method and destination-site requirements.
Sea freight exposes equipment to salt-laden air, high humidity, condensation, temperature fluctuations and potentially long storage periods.
The factory should therefore have a defined export-packaging procedure.
Corrosion-resistant coatings
Protective film
Desiccant
Moisture barriers
Sealed electrical components
Rust-prevention treatment
Protective wrapping
VCI materials where appropriate
The mast and exposed metal surfaces should be protected from moisture and mechanical movement.
Surface corrosion protection
Protective wrapping
Structural bracing
Anti-scratch material
Desiccant
Moisture barriers
The mast should also be secured so it cannot move excessively during ocean transportation. The factory should identify which components require special corrosion protection.
Battery shipping requirements depend on the battery type, configuration and applicable transportation rules.
For lithium batteries, the buyer should obtain the relevant transportation documentation before shipment.
Battery type
Battery weight
Battery capacity
Packaging method
Transportation classification
Required shipping documents
The battery should not simply be treated as another piece of warehouse equipment. The freight forwarder should confirm the applicable ocean-shipping requirements before the container is booked.
Do not forget secondary cargo.
A shipment may contain:
AGVs
Batteries
Chargers
Spare wheels
Forks
Sensors
Controllers
Tool kits
Maintenance parts
These items can change both the final CBM and the weight distribution. Ask the factory to include all accessories and spare parts in the final packing list.
Not necessarily. The unloading equipment depends on:
Gross package weight
Crate dimensions
Center of gravity
Lifting points
Skid design
Container configuration
Port unloading method
Destination warehouse access
A small AGV may be manageable with conventional material-handling equipment. A large counterbalanced AGV or heavily crated vehicle may require substantially higher-capacity equipment.
The manufacturer should provide the package's:
Gross weight
Center of gravity
Lifting points
Fork-entry points
Sling requirements, if applicable
Recommended lifting method
The local unloading contractor can then select appropriate equipment.
Do not estimate the required forklift capacity solely from the AGV's payload rating. The actual shipping gross weight is what matters for unloading.
Not automatically.
A newly imported AGV may not be operational when it reaches the destination. It may have:
Transport locks
Disconnected battery
Protected sensors
Uninstalled forks
Uncommissioned software
Disabled drive functions
The unloading plan should therefore use the lifting and handling points specified by the manufacturer. Only after the vehicle has been safely prepared and commissioned should it be treated as an operational AGV.
The cargo should be secured against:
Longitudinal movement
Lateral movement
Tipping
Sliding
Vibration
Depending on the packaging design, this can involve blocking, bracing, lashing, dunnage, chocks and anti-slip materials.
The exact securing method should account for package weight and center of gravity. The loading team should also follow applicable container-cargo securing practices.
Water intrusion
Structural damage
Seal condition
Evidence of shifting cargo
Broken wood
Damaged corners
Water stains
Torn wrapping
Loose components
Mast
Forks
Wheels
Sensors
Electrical connectors
Battery
Hydraulic components
Protective covers
Photographing the container and crates before unloading is useful for documenting transportation damage.
Yes. If the equipment shows obvious transportation damage, document it before moving or modifying the equipment.
Container number
Seal number
Package number
Photographs
Damage location
Damaged component
Date and time
Notify the relevant logistics and insurance parties according to the shipping contract. Do not assume that a damaged sensor, mast component or electrical enclosure is merely cosmetic.
Add a dedicated logistics section to the RFQ and request the following information.
| Category | Information to Request |
|---|---|
| Vehicle Information | Vehicle dimensions, vehicle gross weight, battery weight, charger weight |
| Packing Information | Crate dimensions, gross package weight, net package weight, CBM, number of packages, stackability |
| Handling Information | Center of gravity, lifting points, fork-entry points, recommended unloading equipment |
| Shipping Information | Container recommendation, loading diagram, lashing method, corrosion-protection method, battery shipping documents |
Do not calculate ocean freight from the AGV's purchase price.
Cargo Volume + Gross Weight + Container Type + Port Charges + Documentation + Inland Transportation + Handling
Depending on the shipping arrangement, additional charges may include:
Origin terminal charges
Destination terminal charges
Customs brokerage
Documentation
Container handling
Drayage
Storage
Demurrage or detention
Cargo insurance
Local delivery
The exact charges depend on the trade lane, Incoterm, carrier and destination.
For a Chinese AGV import, three numbers should be confirmed before the shipping booking:
Final package dimensions
Final gross weight
Final package count
From these, the freight forwarder can determine whether the shipment is suitable for a 20-foot container, 40-foot container or another transportation arrangement.
Final AGV Design → Packing Design → Package Measurements → Loading Plan → Container Booking → Export Shipment → Destination Unloading
This workflow prevents a common procurement problem: discovering after production that the equipment technically fits within the container's cubic capacity but cannot actually be loaded, secured or unloaded efficiently.
📖 AGV Forklift Guide — Essential manual for selection and safety.
⚙️ How AGV Systems Work — A deep dive into navigation and logic.
⚖️ AGV vs. AMR Comparison — Choosing the right technology for your facility.
💰 AGV Cost and ROI — Evaluating investment and payback periods.